Lotus Control is a true reference in the Construction Sector Industrial Plant due our great ability to offer complete solutions for large projects anywhere in the world.
LOTUS CONTROL has been awarded for the supply of BALL, GLOBE, GATE, CHECK, NEEDLE AND BUTTERFLY VALVES for the combined cycle of 65 MW, the first gas power plant in the African country of Togo.
LOTUS CONTROL will supply the TRIFUNCTIONAL VALVES for DUQM project. It is a reverse osmosis seawater desalination plant located in Duqm (Oman) with a capacity of 36,000m3/day.
LOTUS CONTROL has been awarded for the supply of ON-OFF VALVES for the two biggest plants of sulphuric acid of the world that Intecsa Industrial manages in Morocco.
The facilities will be built in the industrial complex of Jorf Lasfar, about 120 kilometers south of Casablanca, and will have the capacity to produce 5,000 tons of sulphuric acid per day, which will be used as raw material for the production of granulated phosphate fertilizers.
LOTUS CONTROL has been selected through Wood amec Foster Wheeler to supply the FILTERS AND STEAM TRAPS of EL-TO project in Zagreb (Croatia).