Lotus Control is a true reference in the Construction Sector Industrial Plant due our great ability to offer complete solutions for large projects anywhere in the world.
LOTUS CONTROL is awarded a fourth package and will supply the plastic valves for the Salalah desalination plant that the UTE is running in Morocco.
LOTUS CONTROL will supply the balloon control valve package for the Agadir desalination plant. It is his fifth award for this project.
LOTUS CONTROL obtains a new award for the supply of air valves and vacuum for the Agadir desalination plant.
has also been awarded for the supply of rupture discs for the Agadir desalination plant.
LOTUS CONTROL will finally supply the gate valves and balloon valves to the Asturian TSK for the five power plants that will be built in Chile.
This project is a consortium formed by TSK and Germany's Rolls – Royce. They have five different locations within the country and will have a total capacity of 475 MW composed of 265 MTU Onsite Energy 16V 4000 engines.
Which will be connected to Chile's electrical system to improve the capacity of the national electrical system.