Lotus Control is a true reference in the Construction Sector Industrial Plant due our great ability to offer complete solutions for large projects anywhere in the world.

This project represents a significant milestone in power generation in Mozambique and will make a significant contribution to the region's electrical infrastructure. The description of the Temane thermal power plant highlights its efficient design and its ability to provide safe and reliable electrical power using natural gas from the Pande-Temane fields. With five gas turbogenerators and a 5x1 multi-shaft configuration, the plant is well equipped to generate a considerable amount of power, meeting the demand of up to 1.5 million households. The inclusion of key facilities such as heat recovery steam generators, a 400 kV substation, and other essential components ensures the plant's comprehensiveness and optimal performance. In addition, the project covers not only power generation, but also crucial aspects such as transportation, electromechanical assembly and commissioning. Commissioning in 2024 is expected to mark the beginning of the Temane 450MW Combined Cycle Power Plant's significant contribution to the power grid, strengthening generation capacity and providing power to a large number of households in the region.

The Salamanca combined cycle power plant is scheduled to begin operations in March 2024, marking an important milestone in Mexico's energy calendar. Located in the state of Guanajuato, it stands as a major project with a capacity of 836.79 megawatts (MW). Comprised of two gas turbogenerators, two heat recovery steam generators, a steam turbine and other essential equipment, the facility is set to play a key role in the region's power supply.

LOTUS CONTROL has been selected to supply the FILTERS and Recirculation Valves packages for the San Luis Potosi Combined Cycle Power Plant, marking a significant step towards efficiency and sustainability in power generation in Mexico. The San Luis Potosi Combined Cycle Power Plant is designed to operate with a net capacity of 804.80 MW at 100% load summer design conditions. Fueled by natural gas, the infrastructure consists of 2 gas turbogenerators, 2 heat recovery steam generators, a steam turbogenerator, a wet tower type main cooling system, main and auxiliary transformers, and all the necessary equipment for optimal integration.

LOTUS CONTROL has been selected to supply BASKET AND SELF-CLEANING FILTERS and Globe, Gate and Check Valves package for the Kilombero Sugar Company's plant in Tanzania, which will be the multinational's largest sugar plant in Africa, Illovo Sugar Africa reports. In line with the country's policy to achieve self-sufficiency by 2025, this new development will increase Kilombero's sugar production, in which Illovo Sugar Africa holds a 75% stake and the Government of the United Republic of Tanzania the remaining 25%, by 144,000 tons from the current levels of 127,000 tons of sugar per year, to 271,000 tons

The Combined Cycle Power Plant "El Sauz" stands as a key infrastructure in the energy landscape, formed by a set of 5 units that deploy their capacity to generate an impressive average of 591 megawatts, which represents an impressive 1.5% of the Effective Installed Capacity of the Federal Electricity Commission (CFE). Strategically located, this power plant plays a crucial role in providing power to the region, supplying a total of 3,900 gigawatt-hours (GWh) of electricity. This considerable flow of energy feeds mainly the states of Querétaro, Hidalgo and Guanajuato, contributing to the economic development and well-being of the communities in this geographic area. The efficiency inherent in the plant's combined cycle ensures effective and sustainable energy production. The five units operate together to optimize performance, generating a significant impact on the region's energy matrix and meeting society's growing electricity demands.