Lotus Control is a true reference in the Construction Sector Industrial Plant due our great ability to offer complete solutions for large projects anywhere in the world.
LOTUS CONTROL is awarded the steam traps package of the two biomass plants that Elecnor is building in Portugal in the towns of Viseu and Fundao.
Both facilities generate a power of 15 MW each and will be fed with forest fuel.
LOTUS CONTROL The Gijon Engineering Company TSK awards a new package of a double blocking and purging ball valve with electrohydraulic actuator, sutu, umbilical, tutu and hpv. for the combined cycle that is running in Jamaica
Lotus control has been collaborating with the technical department of TSK and the ICC engineering in the design and development of the PLET structure. This structure is composed of a DBB valve together with an electrohydraulic actuator, both located in the submarine bottom.
This set receives the electrical signal through the SUTU (Subsea Umbilical termination Unit). Which is connected by an umbilical to the TUTU (Topside Umbilical Termination Unit)
Finally, in the PLET structure we will find that the HPV (High Performance unit) will be responsible for transmitting the electrical signal from the control panel to the TUTU.
LOTUS CONTROL will provide a new package of flame arresters for the cement company that OHL is building in Colombia.
LOTUS CONTROL Expands with two new awards of guillotine valves and air valves, supplies for the Shuaibah desalination plant that is running in Saudi Arabia.
LOTUS CONTROL is awarded a new package of On - off ball valves for the North III combined cycle that is currently being built in the state of Chihuahua, Mexico.
The energy production generated by this combined cycle (907 MW) will be able to supply more than 500,000 homes per year, and it is expected to be completed by the end of 2019.